EV CHARGERS

Installing an EV charger isn’t a DIY project—it’s a safety-critical electrical upgrade. Electric Wire evaluates your entire electrical system, not just the charger.

EV CHARGER FAQ’s

Do I need a permit to install an EV charger in NJ?
Yes, most municipalities require permits and inspections. We handle this for you.

How long does installation take?
Most residential installs are completed in one day, depending on panel capacity.

Can my existing electrical panel handle an EV charger?
We perform a load calculation to determine if upgrades are needed.

Can you install chargers outdoors?
Yes—weather-rated chargers and proper protection are used.

What brands of EV chargers do you install?
We install most major brands and can recommend one based on your needs.

Do you install Tesla chargers?
Yes, including Tesla Wall Connectors.

What is a Level 2 Home Charger?

Level 2 chargers are placed on walls, poles, or ground-installed stands.

They operate between 208-240V and can charge most electric vehicles at a rate of 18 to 28 miles of driving range per hour.

Close-up of a black and silver ChargePoint electric vehicle charger mounted on a yellow wall.
A white Tesla electric vehicle charging station with a black charging cable coiled around it, on a plain white surface.

Our EV Installation Process

1. Site Evaluation

Panel capacity check

Charger location planning

2. Permit & Utility Coordination

Local township permits

Utility requirements

3. Professional Installation

Clean, code-compliant wiring

Proper grounding & protection

4. Inspection & Testing

Township inspection

Charger performance test

5. Walkthrough & Support

How to use your charger

Maintenance & safety tips