EV CHARGERS
Installing an EV charger isn’t a DIY project—it’s a safety-critical electrical upgrade. Electric Wire evaluates your entire electrical system, not just the charger.
EV CHARGER FAQ’s
Do I need a permit to install an EV charger in NJ?
Yes, most municipalities require permits and inspections. We handle this for you.
How long does installation take?
Most residential installs are completed in one day, depending on panel capacity.
Can my existing electrical panel handle an EV charger?
We perform a load calculation to determine if upgrades are needed.
Can you install chargers outdoors?
Yes—weather-rated chargers and proper protection are used.
What brands of EV chargers do you install?
We install most major brands and can recommend one based on your needs.
Do you install Tesla chargers?
Yes, including Tesla Wall Connectors.
What is a Level 2 Home Charger?
Level 2 chargers are placed on walls, poles, or ground-installed stands.
They operate between 208-240V and can charge most electric vehicles at a rate of 18 to 28 miles of driving range per hour.
Our EV Installation Process
1. Site Evaluation
Panel capacity check
Charger location planning
2. Permit & Utility Coordination
Local township permits
Utility requirements
3. Professional Installation
Clean, code-compliant wiring
Proper grounding & protection
4. Inspection & Testing
Township inspection
Charger performance test
5. Walkthrough & Support
How to use your charger
Maintenance & safety tips